+45 26 991 168

Home

Construction of heating plants

Heating plants can be built where waste has become a problem.

Electricity production is needed where electricity and heating are demanded.
By building a thermoelectric power station producing electricity and heat in a single process with knowledge from Agent Capital Energy.

The process is very energy efficient.

Combined heat and power

Cogeneration extracts both heat and electricity from a single fuel.

Thus, the CHP is very energy-efficient.

Only ten percent of the energy is lost, mainly via the flue gases.

Moreover, the improved environmental, and waste is gone.

Agent Capital Energy

Through the interconnection of production it will be an effective way to reduce the use of fossil fuels in terms of architectural design, construction and land / water use planning.1t will be a powerful way to reduce the use of fossil fuels with regards to architectural design, construction and land / water planning.

Agent Capital Energy can also arrange the export of waste.